staging — sample data. Nothing here is a record of the association.

West Ridge Homeowners Association

Minutes of the Board of Directors

· · Clubhouse, 1302 Farley Ln · Regular Meeting
Recorded by Priya Raghavan · Secretary of record: Priya Raghavan
approved
These minutes were approved by roll-call vote at a subsequent meeting.
I.

Call to Order

Called to order

Presiding

Ibrahim Osei

Quorum

Established

Roll call

Board memberPositionAttendance
Ibrahim OseiPresidentPresent
Claudia RennerVice PresidentPresent
Priya RaghavanSecretaryPresent
Peter NkemdiTreasurerPresent
Trevor BooneMember-at-LargePresent
Nadia OkonkwoMember-at-LargePresent
Samuel OrtizMember-at-LargePresent
II.

Review of Previous Minutes

The minutes of the previous meeting were approved as read.

Approve the minutes of the previous meeting

Moved by Ibrahim OseiSeconded by Claudia Renner
Board memberPositionVote
Ibrahim OseiPresidentYay
Claudia RennerVice PresidentYay
Priya RaghavanSecretaryYay
Peter NkemdiTreasurerYay
Trevor BooneMember-at-LargeYay
Nadia OkonkwoMember-at-LargeYay
Samuel OrtizMember-at-LargeYay
Motion passed7 yay · 0 nay · 0 abstain
III.

Discussion Topics

1.

Mailbox cluster — bids received

Three bids were tabled. The cheapest excludes removal of the old cluster, which the board took to be a false economy.

Board vote

Accept the Ridgeline Fabrication bid for the Farley Ln mailbox cluster, including removal

Moved by Peter NkemdiSeconded by Ibrahim Osei
Board memberPositionVote
Ibrahim OseiPresidentYay
Claudia RennerVice PresidentYay
Priya RaghavanSecretaryYay
Peter NkemdiTreasurerYay
Trevor BooneMember-at-LargeAbstain
Nadia OkonkwoMember-at-LargeAbstain
Samuel OrtizMember-at-LargeAbstain
Motion passed4 yay · 0 nay · 3 abstain
2.

Pool key administration

The key roster has not been reconciled since 2023 and several keys are held by former owners.

Action item

Reconcile the pool key roster against the current owner list

Assigned to Nadia Okonkwo

IV.

Action Items Recap

Action itemUpdateDueStatus
Collect three bids for replacing the Farley Ln mailbox clusterThree bids received and tabled. Award made this evening; fabrication lead time is eight weeks.In progress
Have the swale behind 1327 West Ridge Ln inspectedRegrading quote received but above the discretionary limit. Will be tendered with the 2026 reserve work.Delayed
V.

Adjournment

The meeting was adjourned at .